Posts

SEM 2 - PROJECT 5

Image
PROJECT 5 THE BATTLE OF KAMPAR WAR MEMORIAL THESE ARE MY PRESENTATION BOARD FOR MY PROJECT 5. In Project 5, we were required to design a memorial centre at the proposed site. In the requirements of  t horough planning (site analysis and synthesis), architectural, and interior drawings (sketches, design statement, developed final design, perspectives); and a simple drawings of the technicalities, and building services detailing (selection of materials and construction methods chosen). We were having a site visit at Green Ridge Battle of Kampar, Perak. In the presentation boards, site analysis and synthesis were presented in first board as above. Bubble diagram, form and process, design strategies and design concept were presented in second board. In the third board, front, right, left and rear elevations were showed and coloured as well as the shadow were showed clearly  in the drawing. For the technical drawings and sectional drawing as well as det...

SEM 2 - PROJECT 4A&4B

Image
PROJECT 4 REVIVING SUNGAI PINANG PROJECT 4A  THE RIVERBANK SITE ANALYSIS THIS IS THE PRESENTATION BOARD OF SITE ANALYSIS FROM MY GROUP (GROUP 1). THIS IS THE MODEL FROM MY GROUP FOR PROJECT 4A.

SEM 2 - PROJECT 3

Image
PROJECT 3 USM BOOK STOP THESE ARE THE PRESENTATION BOARD FOR MY PROJECT 3- USM BOOK STOP. For this project, we are exposed to challenges of designing a small, usable, and compact yet efficient book stop to meet the requirements. We need to design a single use structure that houses books, magazines or any reading materials throughout designed areas in the university compound.   My concept for my book stop is "Brain". To design a stunning structure to attract students, i use a shape  of brain to design my structure. THESE ARE THE SHAPE(SKELETON) OF MY STUDY MODEL. THESE ARE THE FINAL OUTCOME OF MY STUDY MODEL FOR PROJECT 3.

SEM 2 - PROJECT 2

Image
PROJECT 2 THE URBAN SKETCHES    THESE ARE THE SKETCHES OF MY PROJECT 2. In this project, we are required to produce a series of freehand sketches, of the existing built environment elements that can easily be observed and identified just within the urban area. For my project sketches, i had chose Georgetown as my urban sketches. Georgetown offer some unique style of architecture. This urban area have been a melting pot of different people, cultures, races and religions. The uniqueness of these cities needs to observe and appreciate. I had chose some buildings, Kuan Yin Teng, Lebuh Aceh Mosque, Jubilee Clock Tower and Penang Peranakan Mansion. 

PROJECT 6A&6B

Image
PROJECT 6A THE DANGAUAN THESE ARE MY PRESENTATION BOARDS FOR PROJECT 6A- THE DANGAUAN. In Project 6A, we were required to design a bach/hut at the proposed site. In the requirements of  t horough planning (site analysis and synthesis), architectural, and interior drawings (sketches, design statement, developed final design, perspectives); and a simple drawings of the technicalities, and building services detailing (selection of materials and construction methods chosen). We were having a site visit at Teluk Tempoyak, Batu Maung, Pulau Pinang. In the presentation boards, site analysis and synthesis were presented in first board as above. Bubble diagram, form and process, design strategies and design concept were presented in second board. In the third board, front, right, left and rear elevations were showed and coloured as well as the shadow were showed clearly  in the drawing. For the technical drawings and sectional drawing as well as details...

PROJECT 5A&5B

Image
PROJECT 5 PROJECT 5A- The Neighbourhood Site Analysis The Sardonian THESE ARE THE SITE ANALYSIS BOARDS OF OUR GROUP 3 AT TAMAN TUN SARDON. PROJECT 5A- THE SARDONIAN THIS WERE THE PART (NATURAL PHYSICAL FEATURES) THAT I DID. From the Project 5, we learnt about the basic knowledge and skills in creative, sensitive and responsible architectural neighbourhood space planning. The skills of throughout the site observation, analysis, critical and analytical thinking programme of neighbourhood area.  In group 3, we were devided to perform personal task of the 11 element that should include in the site analysis. For the SWOT, our group member were discuss together to make a conclusion. I'm given a task to do the natural physical features. I had counted the trees at the site, and find out the scientific name of the trees at there.  Most important is I learnt the important of team spirit, the cooperation from each member was appreciated. ...

PROJECT 4

Image
PROJECT 4  The Cubic-Less          THESE ARE THE SKETCHING OF MY PROJECT 4 IN MY SKETCHBOO K. T h e sketching were the draft for my Project 4, The Cubic-Less. In the draft, I had list out the materials to be used in my designs. I also sketched my initial idea and design concept as well as various type of the design can be used in my structur e.  THESE ARE THE END PRODUCTS OF MY PROJECT 4. T he design structure was draw inside 2 A2 size paper. Design statement was written in the middle of first A2, four elevations with the scale of 1:20 and initial idea were draw on it. Connections, joints and forms of retractable structure were arrange in second A2, there are various shape of the structure can be formed. Isometric view of the structure was draw at the corner with the scale of 1:15. I n Project 4, we are given a task to design a functional, small, retractable structure by a company that involved in producing gadget...